Plan now to meet July 2026 safe harbor deadline.
Safe-harbor timeline plan included in your analysis
We map your project timeline against the July 5, 2026 safe harbor deadline so you know what timing keeps eligibility on track.
We show the cleanest “begin construction” path under the updated rules and outline a schedule that fits the 4 year continuity safe harbor.
Run calculatorHow we de-risk a commercial solar project before you commit
- Validate savings against your actual tariff and demand profile
- Map the utility/interconnection steps that control schedule and scope
- Confirm structural/electrical feasibility early to prevent redesign and delay
- Use realistic production assumptions (no inflated outputs)
- Include a performance accountability path (monitoring + support)
Is solar a fit for your facility?
Why companies start now
Our commercial solar solutions












Why commercial teams choose PPM Solar
Frequently Asked Questions
Will solar reduce demand charges?
Sometimes, but not always. Demand charges depend on when your monthly peak occurs, so we model your rate structure and load profile and show whether solar alone helps, or whether storage or operational changes are needed to materially reduce demand charges.
What happens if my roof needs work?
We will flag roof life and structural readiness early. If the roof is near end of life, we typically recommend addressing it first or designing around a re-roof plan so you do not pay twice for mobilization or risk removing and reinstalling equipment.
What warranties and monitoring are included?
We provide clear warranty details in the proposal for equipment and workmanship, and we offer monitoring options so you can see performance and catch issues early. Exact terms depend on system design and equipment selection.