Megacharger
For fast turns. About 60% in 30 minutes.
Heavy-duty EV charging
We design and build 500 kW to 3.75 MW charging sites across Florida.
Plan your siteTwo chargers, one depot. Tesla supplies the hardware. PPM builds the site around it.
For fast turns. About 60% in 30 minutes.
For overnight. About 60% in four hours.
The Megawatt Charging System (MCS) is an open standard designed for medium- and heavy-duty commercial electric vehicles such as freight trucks and transit buses. Under SAE J3271 it supports up to 1,250 volts and 3,000 amps, enough to deliver 3.75 MW into very large batteries.
PPM has been a Tesla partner for more than a decade. We have also secured partnerships with newer manufacturers, including makers of medium-voltage heavy-duty charging equipment.
Smaller project? See home EV charging, home solar and public DC fast charging.
The MCS connector moves megawatt power through two large DC pins. Four small pins handle communication and detection, and a dedicated pin handles earth.
Most electric vehicles on the road still use smaller DC fast-charging plugs, so mixed sites usually get both.



Connector photo: SRago91, Wikimedia Commons, CC BY-SA 4.0, resized. Connector details: Megawatt Charging System, Wikipedia.
A megawatt charger is a power project first. Solar, storage and EV charging are what PPM has built since 2009.
Utility upgrade, transformer and switchgear.
Batteries cover the peaks and trim demand charges.
Canopies and arrays offset daytime energy.
Tesla’s map shows four Megacharger sites planned for Florida. We build the depots that connect them.
At a Megacharger, a Tesla Semi takes up to 1.2 MW and recovers about 60% of its battery in 30 minutes, according to Tesla. On a 125 kW Basecharger the same 60% takes about four hours.
DC charging at roughly 1,000 kW and above, delivered through the Megawatt Charging System (MCS) connector. The MCS standard is rated to 3.75 MW: 3,000 amps at 1,250 volts.
The current Megacharger and Basecharger use the open MCS connector that other truck makers are adopting. Trucks with CCS ports need CCS dispensers, so mixed fleets usually get both.
Add up the cabinets. Two 1.2 MW cabinets can draw 2.4 MW at full output, which normally calls for a dedicated medium-voltage service, a pad-mounted transformer and new switchgear.
Tesla lists the Megacharger from $188,000 for one 1.2 MW cabinet and two posts, before tax and installation (May 2026). Site work is priced after a site visit.
No. The Section 30C charger credit ended for equipment placed in service after June 30, 2026. Federal investment credits still apply to qualifying commercial battery storage. Ask your tax advisor how they apply to your project.
Tell us your truck count and location. We’ll come back with a power estimate.
(352) 309-7727Updated October 2026. Tesla, Semi, Megacharger and Basecharger are trademarks of Tesla, Inc.